The developer already has the massing study. TestFit generated it over the weekend, and they’re scheduling a call to talk about the design.

The Washington State Office of Financial Management’s 2025 A/E fee guideline puts 31% of the A/E fee against construction documents. Swapp, which trains on a firm’s own standards and production history, says it automates up to 80% of construction documentation tasks such as dimensions, tags, views and sheets. That’s the vendor’s claim, not an independent measurement. So the largest phase in the fee is the work these tools are built to automate.
A developer who shows up with that study can push on the document share. The AIA and Deltek’s Architecture Billings Index fell to 44.7 in September 2026. A score under 50 means more firms reported falling billings than rising ones. Firms are absorbing compression in the underlying work in a market that was already soft.
An architect’s answer to whether a project works can carry its own fee, agreed before the design contract.
Why the fee schedule still pays for production hours
The standard fee schedule allocates by phase because, historically, each phase had a predictable labor cost. Construction documents received that share because that’s what they required in hours. The schedule priced effort, and firms kept that allocation through CAD and BIM. Partners will say those documents are the firm’s volume, and they are. They’re also the hours the client can see shrinking. Document tools now finish that work fast enough that a client can ask why those hours are still on the invoice.
On a $500,000 fee, that share is $155,000, priced against the production hours those documents used to take.
A fee set as a percentage of construction cost doesn’t fall when the documents take fewer hours. The percentage follows the building cost. The stamp is still on the same line as the drawings. The client can reopen that share because the stamp has no line of its own on the invoice.
The massing study doesn’t cover site fit, code, or the stamp
Site analysis, code compliance, and the licensed sign-off that makes documents valid have always been inside the standard fee schedule, and they can be priced on their own.
Archistar sells AI permit review to cities, and founder Ben Coorey told Western City Magazine in March 2026: “Anything that is objective, measurable, quantitative — these systems can check it.” Subjective and qualitative calls, he said, still belong with the planners and the officials.
A partner at an architecture firm will object first that clients won’t pay separately for something that used to come inside the package. The developer running TestFit is already paying for feasibility software. The software doesn’t answer whether the scheme works on that site. If the first TestFit study includes that answer for free, the next developer will expect it inside the drawing fee too.
The other objection is putting the firm’s stamp on a massing the developer generated. The scope is what prices that risk: what the review covers, what it excludes, and what a second look costs if the scheme comes back wrong.
Rapid feasibility
TestFit returns geometry. It doesn’t return program fit, zoning compatibility, or the phasing judgment that determines whether a project can be financed as proposed.
A fixed-fee feasibility service prices whether a project is viable before the client commits to a full design contract. That fee is for the local entitlement read and the call on which option to design. Clients who can generate scenarios faster need a faster expert read on which ones work. The developer pays for the read whether or not a design contract follows.
The developer who sends the file wants to know whether that scheme works on this site, under this zoning, with this program. The agreement they sign that week is the fee for that answer, not a credit toward drawings.
Design oversight
Design-build is projected to account for 47% of U.S. construction spending by 2028, according to a 2024 market study from FMI and DBIA. On those jobs the builder holds the contract, and the architect is hired to review and sign off. Naming a scope and a fee is how that review gets a price.
Post-occupancy performance monitoring
After handover, a partner can sell a second fee, one that doesn’t depend on the drawing contract. Architects who designed the building know which systems were specified and where construction departed from the drawings. With that record, a partner can catch drift before a mismatch turns into a capital repair. The owner is already a client, so selling that comparison doesn’t take a second pitch.
Monitoring is the last fee on a project. The first comes up on the developer’s call about the TestFit massing. A partner who joins that call with the read on site fit, zoning, program and phasing already priced can ask the developer to sign for it before anyone talks about drawings.