The contractor’s email is three lines long. The electrical drawings are attached, and the contractor’s design software produced them over a few days. The last line asks whether the firm can stamp them by Friday.

Augmenta says electrical design that took contractors six to eight weeks per phase can now be done in days, AEC Magazine reported. From where the contractor sits, the hard part took a few days and the engineer’s part should take an afternoon.
The contractor already has the drafting. What they’re asking for is the engineer’s license on every calculation behind those drawings, and many engineering firms have never had to say what that costs on its own.
A stamp means the engineer did the engineering
Under the NCEES Model Rules, which state boards adapt for their own rules, an engineer may seal only work done under their responsible charge. That includes having input before the work was finished, reviewing the final documents, and having the authority to make the necessary changes and making them. A set that arrives finished can’t meet the first of those. The Texas engineering board says sealing work you weren’t directly involved in preparing “is commonly referred to as ‘plan stamping’ and is a clear misrepresentation of your involvement with the work.” Rules differ by state, and the firm’s own board sets the line, whoever drew the sheets.
So before the firm can sign, it has to do the engineering. An engineer in the office sets the criteria, reruns the calculations, checks the sheets against the local code, and marks up what has to change. Under the model rules, an engineer who takes over a design another licensee started does that engineering, and the drafting can stay if it reflects their work.
Many lump sums are still built from drafting hours
Over half of A&E projects use a lump-sum fee, according to ACEC data reported by Construction Dive. Firms that build that lump sum from an estimate of hours put a big block of those hours on drafting. Partners left the judgment, and the liability that comes with the seal, inside the total. Nobody had to price it separately, because the hours paid for it.
The contractor has taken those hours out and is asking for the seal as an afterthought. A partner who answers with a quick-review fee has sold the firm’s license for a few hours of checking.
A contractor who gets a seal for a review fee once will ask the next engineer for the same deal, and will mention what the last firm charged. The first firm to answer the Friday email starts setting what engineers in that market get paid for a stamp.
In Deltek’s 46th Clarity study of 692 A&E firms, high performers earned 31% operating profit on FY2024 work and the rest earned 12%, and both groups ran 61% utilization. The gap didn’t come from billing a bigger share of hours. A review fee on leftover hours is still a price built from hours. A partner can set the firm’s own operating profit next to those two numbers.
Price the engineering a seal requires as the job, and write a second-pass price into the quote.
The quote lists the work, the exclusions, and the second pass
A partner builds the quote from what a seal requires: the design criteria, the calculations, the code check for this jurisdiction, and the changes the firm will need before it signs. That’s the job the fee pays for. The contractor’s drafting stays out of it, because they already have it.
Next to that goes what the firm won’t seal: sheets outside the electrical scope, or site conditions the contractor didn’t describe. A contractor who reads that list before signing knows where the firm’s responsibility ends, and so does the engineer who signs.
The partner also prices the second round and names what triggers it: a revised set, a changed load, or a change the firm required that didn’t make it into the drawings. The firm’s changes go back to the contractor, the contractor runs them through the software again, and the engineer has to check the new version before sealing it. Inside a bundled fee, the firm absorbs every round. With a second-pass price written into the quote, the contractor carries that cost and has a reason to check the set before sending it back.
A partner’s first objection is that the contractor won’t pay for engineering they think they already have. Some contractors will take the request to a firm that will sign after a quick look. That firm’s engineer is the one who answers to the board when something in the set is wrong. A partner who spells out what a seal takes has also explained why it costs more than a signature.
When the next contractor asks for a stamp by Friday, the partner replies with a price for the engineering and a date it can be done, and the stamp goes on the set when that work is finished.